NorthParkes: Grinding & Flotation Optimisation



FAST FACTS
CUSTOMER
Northparkes
LOCATION
Parkes, NSW, Australia
PROJECT
$120k Brownfield Grinding and Flotation Optimisation
DATE
03-Jan-2005
PLANT DETAILS
Commenced opencut mining in 1994, and have undertaken underground block caving mining since 1997. The copper concentrate produced is shipped to smelters in Japan (67%), Australia (14%) and other countries (19%).
CONTROL SYSTEM
Schneider PLC, Citect HMI






Project Overview

Improve the stability of the grinding (SAG / Ball Mills) and flotation plant (conventional and Jameson cells), through improved instrumentation and control strategies.

MIPAC Scope

• Design, install and commission control loop in grinding and flotation plants
• Specify novel instrumentation solutions (Flash flotation density control)
• Training site personnel on practical loop-tuning techniques

Technical Highlights

• Design and commissioning of stable SAG mill power / load control
• Averaging-level control on all sumps
• Accurate hydrocyclone pressure control
• Flotation level control (including feedforward control)
• Successful transfer of process control skills to site personnel

Results

Improved plant performance through:
o Increased plant throughput
o Improved circuit stability
o Increased SAG Mill liner life

Back to Project Summary | Tell A Friend